Table 13- Details of pending Breakdowns / Shutdowns at 8 AM on dated 29-08-2023
Equipment Outage Date Outage Time Remarks
Breakdowns in TRANSCO (DTL)
400kV System
Nil
220kV/66kV/33kV System
220kV Maharani Bagh -Masjid Moth Ckt- II 29-01-2023 15:50 Cable Caught fire
220kV Dial -Bamnauli - II 31-01-2023 12:50 R phase cable punctured by  NHAI during digging work
220kV Geeta Colony-Wazirabad-I 17-05-2023 12:05 R phase Conductor snapped.
220kV/66kV,100MVA TX-II Parkstreet 07-06-2023 14:45 Differential, B phase,86
220kV Bus-II at R.K. Puram 20-08-2023 12:07 (Due to 220kV bus-II isolator damage)
Shutdowns in TRANSCO (DTL)
400kV System
.400/220kV 315 MVA ICT-1 at  Bamnauli 03-03-2022 11:15 ICT -1 Shifted to Tikrikalan
220kV System
100 MVA-IV(220/66) kV at Shalimar Bagh 09-06-2022 11:25  Shifted to Naraina
Breakdowns / Shutdowns being attended by DISCOMS
33kV Masjid Moth to 33kV Masjid Moth 07-08-2023 07:12 Y Phase Single Cable faulty BRPL South
66kV Park Street to Ridge Valley 14-08-2023 13:10 B Phase Cable faulty BRPL South
66kV Mundka to Nangloi Ckt 30-06-2023 15:40 B Phase Cable faulty BRPL West
66kV NJF to DJB Ckt-1 07-08-2023 08:15 B Phase Cable faulty BRPL West
33kv Naraina to A-43 Mayapuri Ckt-1 22-08-2023 01:10 B Phase Single Cable faulty BRPL West
66kV Gas turbine power to Akshardham temple 23-08-2023 All Pahse Cable Faulty BYPL
66kV Wazirabad to Ghonda Ckt-1 28-08-2023 01:02 Y-Pahse Cable Faulty BYPL
66kV Park Street-DMRC Ckt-I & II 19-10-2021 10:28 Shutdown of six months for grid shifting work at  DMRC end DMRC
33kV IP Bay-28-Connaught place 26-06-2023 R Phase  faulty NDMC
Table 14- No. of 11kV cables in Breakdown
Central 0
East 5
South 9
West 10
North 0
N/West 0
Total 24